Construction Cost Estimating

      

Difference between a Construction bid and an estimate

The terms bid and estimate interchangeably used by customers many times and sometimes contractors often connect some different terms for this two words. Actually they two define different parts of the process of estimating a contractor?s inner costs and confirm the final chargeable price for the customer. For the larger projects or public sector construction work, here are some tips that can help in estimating and bidding.

Estimates are for costs: Before doing any kind of work customer ahs a curiosity about the price that will be demanded for the work. To handle this contractor should have knowledge about the expenses on the job like the costs of materials and labor. A contractor can make a profit in the difference between the estimated price and the estimated costing in a project as an estimated is information for the customer but it doesn?t need any commitment from the both side.

Accuracy levels of the Estimates: The estimated price for a job has to be more perfect as the high or low estimated price for a job can create a doubt for a contractor in the mind of the customer. A contractor should keep an estimate that should not be much affected with vary of the cost here are some tips to help in estimating the costs.

? Introductory estimate: This helps to evaluate the main interest of a project where some projects can be come out with a risk that is not expected before. Introductory estimates help a contractor in this case and help to find better projects.
? Square-foot estimation: A possible project represents a next-level estimation that can be used in industry-standard unit measures per square foot and it will be multiplied with the number of square-feet.

? Assembling estimate: It generally clarifies the figures and calculations by contemplating every separate part of a construction project, such as foundations, flooring, roofing, windows and sanitation; each and every thing need different levels of resources. All these different resources are compared with the normal size of the square foot estimate.
? Final estimate: This is one of the most detailed accuracy and often requires written commitments from both the partners and subcontractors. It is like an official commitment that can be made to the customer.

About Construction bids: A stable offer attracts customers easily and run the project well, this is called the construction bid. Here a contractor has to be committed to the customers for providing them a fixed construction in a reasonable price and within a scheduled time. If the customer agrees with it then the contractor has to work as per the bid with fixed price and have to provide satisfactory work to the customer.

Time for estimates and bids: For bigger projects, sometime bids and estimates take a substantial time effort that should be keep in mind. And for smaller projects customers want to take fast decisions and finish the work as fast as it can be done. In the smaller projects, there might have a sign with the contractor that offers a reasonable estimate for the week or for some extra days. Here the price estimate works as a bid for both parties for working in a right way.

Difference between a Construction bid and an estimate

Saving time and energy in the time of making estimates and bids: A construction estimate must be accurate but has to done quickly as it will figure out the future of the project and it is a part of job of the contractors. There are many software programs that have easy-to-use applications with a built in database for unit costs.