Download Estimated Construction Cost Spreadsheet
Construction cost estimators require correct information about every particular to generate a precise estimate. Estimates vary as per the size and type of the construction along with the quantity and quality of the materials used.
Any construction, irrespective of its type requires wooden as well as no-wooden materials. Hence detailed information about the number or quantity of the item along with its cost per unit is essential.
An estimation of the labor cost must also be prepared. Acquiring the total misc. unit cost and total project cost helps in generating an organized and focused construction cost estimate and prevents extra and unnecessary expenses.
While preparing an estimate of wooden items the estimator should include the total cost of wooden items comprising plain wooden side bottoms for windows and doors, plain wooden pillars, etc. Total cost for non- wood material must include bags of cement, bamboo, steel roof, rod for ground foundation, window and door hardware, etc.
Labor cost must comprise expenses for concrete engineers with labor cost and wooden engineers cost. Miscellaneous unit costs must include expenses for toilet & bathroom, water tank, water pump with motor, etc.
Quantity takeoff or estimating sheet is the general form of listing and taking off types, sizes and quantities of material required in a bidding process of any construction work.
This quantity takeoff sheet also includes ductwork, piping, labor, risk cost and summation of all the estimated expenditure.
In any construction work, it is very important to get the estimation of the construction in one place at orderly manner.
That's why a properly arranged construction takeoff sheet is required to do the whole work without any hassle. In a construction take off sheet, you find the details of all the requirements for the construction.
Download Construction Cost Spreadsheet
The types of materials, the quantity of materials, the number of labors, the number of days and the sequence of work all things are enlisted in the construction take off sheet.